SERENITY - Oct 16 2005

101601.jpg
101601.jpg

Second set of things have been glued on. These were a bit easier as the mating surface was not curved like the first set

101602.jpg
101602.jpg

Yes more sanding and fine tuning of the surface finish

101603.jpg
101603.jpg

Even the bottom needed work

101604.jpg
101604.jpg

Close up

101605.jpg
101605.jpg

101606.jpg
101606.jpg

The 3rd set required the most sanding and test fitting. At this point I thought I got it right and took the photos. However after looking through my references again they were not right so out came the files again

101607.jpg
101607.jpg

These took a lot of work so you are going to get several photos of the item.

101608.jpg
101608.jpg

101609.jpg
101609.jpg

101610.jpg
101610.jpg

101611.jpg
101611.jpg

Yay

101612.jpg
101612.jpg

101613.jpg
101613.jpg

Now the next time you see the ship look for these things that took me 3 days to do.