SERENITY - Sept 15 2005 |
A few more openings cut out |
Forming the engine shield through test fitting |
Once I got the correct shape through trial and error I made 2 more to be installed on the engines |
2 moulds made and getting ready to make 2 more. I wasn't quite a few so I can cast several at the same time |
Another view |
The RTV poured. This stuff is slightly different from what I used before as it had a red type dye in the catalyst so when I am mixing the stuff up I can tell if it has been mixed thoroughly. This stuff also cures within 12 hours and starts to set up within about 15 minutes. That caught me off guard a few times which results in unusable stuff |