SERENITY - Sept 15 2005

09151.jpg
09151.jpg

A few more openings cut out

09152.jpg
09152.jpg

Forming the engine shield through test fitting

09153.jpg
09153.jpg

Once I got the correct shape through trial and error I made 2 more to be installed on the engines

09154.jpg
09154.jpg

2 moulds made and getting ready to make 2 more. I wasn't quite a few so I can cast several at the same time

09155.jpg
09155.jpg

Another view

09156.jpg
09156.jpg

The RTV poured. This stuff is slightly different from what I used before as it had a red type dye in the catalyst so when I am mixing the stuff up I can tell if it has been mixed thoroughly. This stuff also cures within 12 hours and starts to set up within about 15 minutes. That caught me off guard a few times which results in unusable stuff